News
Liza Unity achieves background gas flare within deadline – ExxonMobil – -new compressor being installed on problematic Destiny platform
ExxonMobil yesterday said that the gas compression and injection systems on the Liza Unity Floating Production, Storage and Offloading (FPSO) vessel have been safely commissioned in around half the normal industry time and has achieved background flare as designed and within the 60-day period outlined in the Liza Phase 2 Environmental Permit.
The article Liza Unity achieves background gas flare within deadline – ExxonMobil appeared first on Stabroek News.