Power shutdown occurred after contractors damaged transmission line – Indar – Carib Vibe Radio
News

Power shutdown occurred after contractors damaged transmission line – Indar

A shutdown of GPL’s  Demerara-Berbice Interconnected System (DBIS) occurred today after contractors working in the Diamond Housing Scheme damaged the 69 kVA transmission line.

The article Power shutdown occurred after contractors damaged transmission line – Indar appeared first on Stabroek News.

Related Articles

Leave a Reply